Nhance Digital Twin Improves Workspace Experience
by Varshini in

How a Creative Workspace Used a BIM Twin to Align Design with Experience
A global design agency implemented Nhance’s Digital Twin to integrate their BIM model with live building data, improving room usage, comfort, and operational visibility across all four floors.
Sector/Industry
Design-Led Commercial Real Estate
Platform
Nhance Digital Twin
Solution
BIM Integration + Occupancy & IAQ Analytics
PROBLEM
Bringing Data into the Design-Centric Space
The client had a detailed BIM model but no real-time data or feedback loop. Room usage, IAQ, and energy patterns weren’t tracked, leading to over-conditioned zones and underutilised spaces.
SOLUTION
Turning the BIM Model into a Live Operational Dashboard
Nhance ingested the BIM model and layered live MEP data, sensor feeds (CO₂, PM2.5), and people presence analytics directly into the model. Every floor plan became a dynamic dashboard, blending design clarity with operational insights.
- BIM model integrated with real-time MEP data
- Live IAQ and occupancy analytics
- Zone-level insights for comfort and performance
- Implemented without disrupting daily operations
RESULTS
Smarter Rooms, Healthier Air, Seamless Execution
- 25% increase in meeting room efficiency
- 20% improvement in indoor air quality
- Full operational visibility for FM and design teams
- Seamless implementation during live operations




